Building Envelope Dry-in Complete

Construction Corner: What does Envelope Dry-in mean?

The envelope dry-in milestone in construction refers to the point at which a building's exterior envelope is completed and weather-tight. This milestone means that the structure is protected from the elements, and construction can continue safely inside without being affected by rain, wind, or other weather conditions.

Key components typically included in reaching the envelope dry-in stage are:

  1. Roofing: Installation of the roof structure and covering.

  2. Windows and Doors: All windows and doors are installed and sealed.

  3. Exterior Walls: The building's exterior walls are completed and weather-resistant.

Reaching this milestone is crucial because it allows interior work, such as electrical, plumbing, and finishing, to proceed without interruptions due to weather-related issues. It also marks a significant progress point in the construction schedule.